All she does is do her job. Cindy working the geese on #13 pond.
Monday, February 29, 2016
Wednesday, February 24, 2016
Quick moving snow storm
Well we had a couple of inches of what is now very very fast melting snow. Driving was certainly entertaining this morning.
Friday, February 19, 2016
Thursday, February 18, 2016
Beautiful weather the next few days.....
With
spring almost upon us and after having endured the cold of winter it is not a
surprise that we are all excited to get out and play some golf! This time
of year, more than ever, is the time to exercise patience. Checking the
frost level in greens we really aren’t that close to being able to safely open
to play without doing potentially harmful damage to our putting surfaces. Due
to the unseasonably warm weather expected the next few days it’s understandable
that when other daily fee courses begin to open we start to feel the pressure
to follow their lead.
Due
to the maintenance level we as a staff and you as club members have for our golf course the damage
issues we would face compared to a couple of rounds of “Indian summer” golf is
not worth the cost. The soil temperatures at this point are only suitable for
the growth of Poa Annua which will fill every ball mark and cleat mark made
this time of the year. In addition we have only seen a couple of days of
thawing weather which means we have a long way to go before the frost is out of
the ground and the golf course can be opened.
The biggest issue we face with this decision is the frost. As I have outlined in previous articles with frost remaining in the soil profile, water from the thawing ground on top has nowhere to go and so the top layer of soil becomes completely saturated and unstable under foot and cart traffic. This puts fine turf areas (especially putting greens) at risk of becoming severely damaged if traffic is not held off.
The biggest issue we face with this decision is the frost. As I have outlined in previous articles with frost remaining in the soil profile, water from the thawing ground on top has nowhere to go and so the top layer of soil becomes completely saturated and unstable under foot and cart traffic. This puts fine turf areas (especially putting greens) at risk of becoming severely damaged if traffic is not held off.
As
a staff we will monitor conditions of the frost line on a daily basis to
determine when the course will be ready for play. This is the worst part of my
job due to the fact that I want the course open as much as anybody but, I need
to have conditions right so we don’t have issues later in the year because we
jumped the gun. Once the course is ready, and is dry enough we will put the
flagsticks in the greens and open the course for play.
Thank you very much for being understanding during this unseasonably warm time and please exercise patience as you await the beginning of the golfing season at Panther Creek Country Club.
Thank you very much for being understanding during this unseasonably warm time and please exercise patience as you await the beginning of the golfing season at Panther Creek Country Club.
Greg Willman
gwillman@panthercreekcc.com
Thursday, January 28, 2016
New staff visiting
New members of the Panther Creek team getting a tour of the maintenance facility. Excited to start 2016!!
Wednesday, April 9, 2014
Mulch Beds
If you have been on the course in the past couple years I am sure you have taken note of the mulch beds. A lot of them include a hole sign but there are others that do not. All of these beds have been overtaken by a plethora of plant material, mainly perennials that have continued to get larger and larger every year. I started in 2006 and there have been minimal changes to a vast majority of these beds until this Spring. This week we embarked on revamping all of these beds that have become unsightly.
Every bed needs cleaned up, which is normal process for this time of year. Then all of the existing plant material is dug up and removed, while dividing any ornamental grasses and other perennials such as lilies. This plant material has simply become too large for the occupied space. After all the plants have been removed and divided the material is then replanted in a more organized and correctly spaced design. We are using a majority of the current plants along with some new additions where applicable.
I hope that everyone enjoys this fresh take on some existing herbaceous and ornamental features, as the crew is putting a lot of time and hard work into these improvements. I have included some pictures of the process to date.
Every bed needs cleaned up, which is normal process for this time of year. Then all of the existing plant material is dug up and removed, while dividing any ornamental grasses and other perennials such as lilies. This plant material has simply become too large for the occupied space. After all the plants have been removed and divided the material is then replanted in a more organized and correctly spaced design. We are using a majority of the current plants along with some new additions where applicable.
I hope that everyone enjoys this fresh take on some existing herbaceous and ornamental features, as the crew is putting a lot of time and hard work into these improvements. I have included some pictures of the process to date.
Monday, March 24, 2014
Spring Update
A spring project that was completed this past week before
the course opened was the new concrete approaches on bridges #5 and #6. This is
a picture of the approach on #5 which was particularly rough due to large
amounts of water over the past twenty years eroding the dirt from underneath it
therefore compromising the integrity of the concrete. Before the new approach
was installed we drilled steel rods into the existing path and bridge abutment.
This will help in the future to negate that problem from occurring again. We also
stuffed all of the concrete after it was demolished into the cavity under all
three approaches that were rebuilt. The reason for this work to be done while closed
is the fact that it needed three to four days curing time before carts could
resume usage. It turned out very well and I hope it goes as long as the bridge
lasts.
Turf Blog: http://pcccgrounds.blogspot.com/
Twitter: @PantherGrounds
Instagram: @PantherGrounds
I hope to see you all on the course very soon,
Greg Willman
546-1469
Subscribe to:
Posts (Atom)










